Summary of explaining captions below
(Click on images for larger versions.)
20070208-01-sm.jpg |
20070208-02-sm.jpg |
20070208-03-sm.jpg |
20070208-04-sm.jpg |
20070208-05-sm.jpg |
20070208-06-sm.jpg |
20070208-07-sm.jpg |
20070208-08-sm.jpg |
20070307-01-sm.jpg |
20070307-02-sm.jpg |
20070308-01-sm.jpg |
20070308-02-sm.jpg |
20070309-01-sm.jpg |
20070309-02-sm.jpg |
20070309-03-sm.jpg |
20070309-04-sm.jpg |
20070309-05-sm.jpg |
20070309-06-sm.jpg |
20070312-01-sm.jpg |
20070312-02-sm.jpg |
20070312-03-sm.jpg |
20070314-01-sm.jpg |
|
20070316-01-sm.jpg |
20070316-02-sm.jpg |
20070316-03-sm.jpg |
20070316-04-sm.jpg |
20070316-05-sm.jpg |
20070319-01-sm.jpg |
20070319-02-sm.jpg |
20070319-03-sm.jpg |
20070319-04-sm.jpg |
20070319-05-sm.jpg |
20070319-06-sm.jpg |
20070321-00sm.jpg |
20070321-01sm.jpg |
20070321-02sm.jpg |
20070322-01sm.jpg |
20070201-01 Waiting for snow to clear before starting 20070205-01 Boom truck on site, working on flap 20070205-02 Chris working on removing flap 20070205-03 Three flaps removed end of first day 20070206-02 Water leaking from cut 20070206-01 Tristan Cutting B shelter from transporter frame, Peter supervising 20070206-03 Lifting first roof section 20070206-04 Tristan cutting with torch and Chris clearing for torch 20070206-05 Cutting Post with torch 20070206-06 Starting building lift 20070206-07 Building lifting 1 foot- note outrigger 20070206-08 Building lifting 3 feet 20070206-09 Building lifting 4 feet 20070206-10 Building lifting 6 feet 20070206-11 Building swinging 20070206-12 Building moving toward trailer 20070206-13 Building on trailer 20070206-14 Site at end of second day 20070206-15 Site at end of second day 20070206-16 Building leaving mountain 20070206-17 Uncovered pedestal 20070208-01 Fastening final shelter 20070208-02 Final shelter in the air 20070208-03 Three exposed pedestals 20070208-04 Three wrapped pedestals 20070208-05 Pier being lifted 20070208-06 Piers loaded 20070208-07 Empty SE arm 20070208-08 Empty NE arm 20070209-01 Crane on site 20070209-02 Discussing procedures 20070209-03 Crane raising boom 20070209-04 Crane block 20070209-05 First pedestal being lifted 20070209-06 First pedestal in the air 20070209-07 First pedestal on trailer 20070209-08 First pedestal leaving site 20070209-09 Second Pedestal being lifted 20070209-10 Second pedestal swinging to truck 20070209-11 Last pedestal being lifted 20070209-12 Last Pedestal leaving the site 20070209-13 Empty NorthEast arm 20070209-14 Forklift tango to lift off truck 20070209-15 Three pedestals at Admin. Complex 20070210-01 First pedestal buttoned up 20070307-01 Start taking tracks apart 20070307-02 Load of I-Beams from track and transporters 20070308-01 Taking vacuum pipe apart 20070308-02 Lifting laser hut to become large doghouse 20070309-01 Moving final pipe segment 20070309-02 Jackhammering pier bases 20070309-03 Northeast arm cleared of garbage finally 20070309-04 Southeast arm to be cleaned up 20070309-05 Full Northeast Arm 20070309-06 MMT's view of site 20070312-01 Removing the last few piers 20070312-02 Cleaning up the concrete and metal 20070312-03 Pulling out the inside piers 20070314-01 Demolishing the internal concrete Demolition complete 20070316-01 SW view of lower area 20070316-02 NE view of lower area 20070316-03 Where NE arm was --- looking SW 20070316-04 Where NE arm was --- looking NE 20070316-05 View from MMT 20070319-01 Loading pedestal on trailer #3 20070319-02 Landstar rig #3 with load on 20070319-03 Adding protective tarp to rig #2 20070319-04 Fastening protective tarp on #3 20070319-05 Convoy almost ready to go 20070319-06 Long view of loaded rig #1 20070321-00 Pedestals arrive at Palomar 20070321-01 Picking up pedestal with crane 20070321-02 Placing last pedestal 20070322-01 Pedestals at Palomar